Detailed Modeling and Transient Analysis for Nuclear Power Plant Turbine
-
摘要: 以岭澳一期核电厂汽轮机部件为原型,利用系统程序RELAP5对其进行详细数值建模研究。通过在100%功率稳态工况下的计算证明,详细的汽轮机数值建模弥补了简化建模中焓值计算误差较大的缺陷。将详细的汽轮机数值建模整合到全范围核电厂热力系统模型中进行瞬态分析,并与岭澳一期核电厂原始实验报告中汽轮机负荷从97%功率水平阶跃变化至87%功率水平瞬态运行工况的数据曲线进行对比。结果表明,稳态模型的焓计算值与电厂实际值误差在2%以内,瞬态模型的分析参数趋势符合电厂实际情况。Abstract: This paper takes the turbine in Ling’ao phase I nuclear power plant as a prototype, and details the numerical model of the turbine based on RELAP5. The calculation under the stable operation condition at 100% power indicates that the detailed turbine numerical modeling remedies the larger calculation error for the enthalpy values by simplified modeling. The detailed turbine numerical modeling is incorporated in the thermodynamic system model for the whole nuclear power plant to conduct the transient analysis, and comparison with the data curves under the step power change from 97% to 87% of the turbine load in the original test report is carried out. The results showed that the error between the enthalpy calculation value for the steady-state model and the actual value of the plant is within 2%, and the analysis parameters for the transient model are in line with the actual situation of the nuclear power plant.
-
Key words:
- Turbine /
- Detailed modeling /
- Transient analysis /
- RELAP5
-
计量
- 文章访问数: 12
- HTML全文浏览量: 4
- PDF下载量: 0
- 被引次数: 0