Application of Passive Residual Heat Removal System under Blackout Accident of Chinese Advanced Nuclear Power Plant
-
摘要: 采用RELAP5/MOD程序对先进堆全厂断电事故进行分析计算,论证非能动余热排出系统对事故的缓解能力。分析表明,先进堆在发生全厂断电事故后,完全能够依靠非能动余热排出系统导出堆芯余热,保证反应堆的安全;先进堆非能动余热排出系统的设计总体上是成功的。Abstract: The passive residual heat removal(PRHR) system provides emergency core decay heat removal during the transient accidents such as blackout or loss of forced reactor coolant flow.Referenced to the design of AP1000,Chinese advanced nuclear power plant applied PRHR to mitigate the accident consequence only by the natural circulation.The blackout accident was calculated to identify the capacity of PRHR of Chinese advanced nuclear power plant by using RELAP5/MOD3 code.The analysis results show that PRHR of HLS can build the natural circulation and remove the core residual heat after the blackout accident successfully.
-
计量
- 文章访问数: 6
- HTML全文浏览量: 2
- PDF下载量: 1
- 被引次数: 0