Safety Analysis Focused on Fuel Reloading in Nuclear Power Station in Guangdong Province
-
摘要: 2001年4月,法国Dampierre4机组发生了燃料装载错误,导致次临界度降低。虽然广东核电机组一直采用“蛇形”装料方式,仍然需要对其发生类似装料错误后的次临界度进行计算,分析其堆芯的安全性,以验证广东核电机组装料过程的安全保障。本文通过对不利循环的保守计算分析表明,如果岭澳核电站和大亚湾核电站发生与法国Dampierre4机组同样装载错误,虽然会造成一定程度的新燃料集中摆放,但仍能满足FSAR要求的次临界度,可以保证不发生超临界的安全事故。Abstract: Reloading error took place at Dampierre nuclear power Station unit 4 in April 2001 in French,which lowered the sub-critical margin.Although “the snake” reloading process is adopted in nuclear power Station in Guangdong Province,it is still necessary to perform the safety analysis focused on the similar accident during the fuel reloading,in order to verify the safety of fuel reloading process in nuclear power Station in Guangdong province.Based on the conservative calculation considering the disadvantageous fuel cycle of Ling’ao and Daya Bay reactors,the results show that the similar reloading error will result in the arrangement of new fuel assemblies in one place,but the sub-criticality required by FSAR can be satisfied and safety can be guaranted.
-
Key words:
- Fuel /
- Reactor core /
- Fuel reloading /
- Sequence
-
计量
- 文章访问数: 5
- HTML全文浏览量: 2
- PDF下载量: 0
- 被引次数: 0