Improvement of Static Load Test Technology for Polar Crane in Ling’ao Nuclear Power Station
-
摘要: 为保证岭澳核电站环形吊车载荷试验(特别是双钩联合抬吊静载试验)的顺利进行,对环形吊车的试验工具和试验方法进行了技术改进。本文简要介绍了百万千瓦级压水堆核电站环形吊车静载荷试验的技术要求、常规试验方法和岭澳核电站环形吊车静载荷试验的改进措施。Abstract: The test instrument and method for polar crane are improved to facilitate the load test (especially double-hook combine static load test ). The paper introduces the test requirement and conventional test method for polar crane static load test for 1000MWe PWR nuclear power station and the static load test technology improvement for polar crane in Ling’ao Nuclear Power Station .
-
Key words:
- Nuclear power station /
- Polar crane /
- Static load test /
- Technology improvement
-
计量
- 文章访问数: 4
- HTML全文浏览量: 1
- PDF下载量: 0
- 被引次数: 0