Fault Analysis and Improvement of Regional Power Monitor Loop for No.2 Shutdown System of Heavy Water Reactor
-
摘要: 秦山第三核电厂的CANDU-6型重水堆的二号停堆系统多次由于区域功率监测回路故障而出现通道误脱扣现象,通过其中3起典型的误脱扣故障,对区域功率监测回路放大器及放大器内部的增益电位计进行分析,找出故障的直接原因是放大器的电位计故障。对电位计故障进行分析,确认电位计故障的根本原因是长期调整后滑动接触片及电阻丝磨损。针对故障的根本原因,制定了定期检查、更换电位计等维修策略,提高了区域功率监测回路的可靠性。Abstract: No.2 shutdown system of CANDU-6 heavy water reactor in Qinshan III Nuclear Power Plant tripped several times due to the failure of the regional power monitor loop. Typical three channel trip failures were analyzed. The amplifier and potentiometer in the regional power monitor loop were analyzed theoretically and practically. Potentiometer failure contributed to the channel trip. Abrasion of contact patch and resistance thread because of long-term adjust is the main reason of potentiometer, according to the analysis of the failure potentiometer. Maintenance strategies such as periodic check and potentiometer replacement are developed, and the reliability of the regional power monitor loop is improved.
-
Key words:
- Shutdown system /
- Regional power monitor /
- Trip /
- Potentiometer
-
计量
- 文章访问数: 44
- HTML全文浏览量: 15
- PDF下载量: 0
- 被引次数: 0