Failure Analysis and Treatment of Temperature Detector in Main Loop for Qinshan Phase Ⅱ NPP
-
摘要: 针对秦山第二核电厂1、2号机组运行初期发生的主环路温度计的典型故障,通过对温度计进行解剖和材料分析、与其他核电厂对比分析、试验室和现场振动分析,确定主环路温度计的故障原因,提出处理方案。结果表明,温度计失效原因为套管的强度不够大,套管与温度计发生碰撞导致温度计末端损坏和破裂;温度计外壁加环改进方案可有效解决故障问题。Abstract: For the representative failure happened to the reactor coolant temperature detector in Qinshan Phase Ⅱ Nuclear Power Plant, we discovered the cause of failure and tried to solve this problem by analyzing the structure of material, the situations in other nuclear power plants, the vibration in laboratory and in field. The analysis shows that the reason is the collision happened between the protective well and the temperature detector. The temperature detector will be broken or ruptured. Adding the ring outside of the temperature detector is proved to work well.
-