Advance Search
Volume 35 Issue 3
Feb.  2025
Turn off MathJax
Article Contents
Xie Honghu, ZhOu Peng, Liang Xiaolong, Liu Xiaohua. Technical Improvement of Shims and Its Procedure for Gap Measurement and Adjustment for CPR1000 Steam Generator Upper Horizontal Support[J]. Nuclear Power Engineering, 2014, 35(3): 73-75. doi: 10.13832/j.jnpe.2014.03.0073
Citation: Xie Honghu, ZhOu Peng, Liang Xiaolong, Liu Xiaohua. Technical Improvement of Shims and Its Procedure for Gap Measurement and Adjustment for CPR1000 Steam Generator Upper Horizontal Support[J]. Nuclear Power Engineering, 2014, 35(3): 73-75. doi: 10.13832/j.jnpe.2014.03.0073

Technical Improvement of Shims and Its Procedure for Gap Measurement and Adjustment for CPR1000 Steam Generator Upper Horizontal Support

doi: 10.13832/j.jnpe.2014.03.0073
  • Received Date: 2013-04-20
  • Rev Recd Date: 2014-03-07
  • Available Online: 2025-02-15
  • Taking China Modified Pressure Reactor 1000 MW nuclear electrical station(CPR1000)steam generator(SG) as an example, the origin for the difference between gap measured and real gap for the thermal expansion of SG upper horizontal support is analyzed, and the optimized schemes ware proposed to improve the shim structure and the procedure about gap measurement and adjustment. The results show that the scheme is an effective way to solve the difficulties met during gap measurement and adjustment.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (73) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return