The power up-rates analysis of 310MW unit in Qinshan NPP is based on the main equipment potential. The preliminary power for up-rates is defined and the problems which affect the up-rates are identified through theory analysis. The tests are performed according to the theory analysis. The parameters of primary loop and second loop are adjusted. The final power rating is confirmed on the basis of tests.