Advance Search
Volume 36 Issue 5
Feb.  2025
Turn off MathJax
Article Contents
Wang Wenli. Beryllium Localization and Verification Test of PHWR Fuel[J]. Nuclear Power Engineering, 2015, 36(5): 208-210. doi: 10.13832/j.jnpe.2015.05.0208
Citation: Wang Wenli. Beryllium Localization and Verification Test of PHWR Fuel[J]. Nuclear Power Engineering, 2015, 36(5): 208-210. doi: 10.13832/j.jnpe.2015.05.0208

Beryllium Localization and Verification Test of PHWR Fuel

doi: 10.13832/j.jnpe.2015.05.0208
  • Received Date: 2015-01-09
  • Rev Recd Date: 2015-05-04
  • Available Online: 2025-02-15
  • In order to manufacture the CANDU fuel bundles with domestic Beryllium completely, this paper analyzed the operation requirements for the fuel bundles coating with domestic Beryllium, and developed a special production project on the basis of the process qualification, and the bundles had been loaded in the unit 2 of the third Qinshan Nuclear Power Plant for verification test. It shows that the quality and performance of the fuel bundles coating with domestic Beryllium meets the requirements of the Qinshan CANDU units. It will be the best quality to optimize the coating process control.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (80) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return