Chu Shaoxian, Yang Jicheng, Zhu Wangqiang, Shi Qing. Configuration and Nuclear Safety of CEPR Multiple On-site Power Supply System[J]. Nuclear Power Engineering, 2015, 36(S1): 20-23. doi: 10.13832/j.jnpe.2015.S1.0020
Citation: Chu Shaoxian, Yang Jicheng, Zhu Wangqiang, Shi Qing. Configuration and Nuclear Safety of CEPR Multiple On-site Power Supply System[J]. Nuclear Power Engineering, 2015, 36(S1): 20-23. doi: 10.13832/j.jnpe.2015.S1.0020

Configuration and Nuclear Safety of CEPR Multiple On-site Power Supply System

doi: 10.13832/j.jnpe.2015.S1.0020
  • Received Date: 2015-05-08
  • Rev Recd Date: 2015-07-31
  • Available Online: 2025-02-15
  • Taishan CEPR Nuclear Power Plant implements the world advanced third nuclear power technology. CEPR nuclear safety futures are specially integrated into the design of electrical power supply systems. The multiple on-site power sources configured in CEPR electrical power supply system indicate the characteristics of redundancy, diversity and separation, and satisfy the principle of Defense-in-Depth. In the design of NI safety power supply systems, the emergency power supply in different levels provide enough power supply under all Design Basic Conditions and Design Extension Conditions, for which they are fully demonstrated by the safety analysis under loss of off-site power supply systems.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (79) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return