Guo Xinwei, Liu Yu, Man Xiaoyu. Application of 4D Simulation in the Installation of Nuclear Island Primary Loop Equipment[J]. Nuclear Power Engineering, 2015, 36(S1): 24-25. doi: 10.13832/j.jnpe.2015.S1.0024
Citation: Guo Xinwei, Liu Yu, Man Xiaoyu. Application of 4D Simulation in the Installation of Nuclear Island Primary Loop Equipment[J]. Nuclear Power Engineering, 2015, 36(S1): 24-25. doi: 10.13832/j.jnpe.2015.S1.0024

Application of 4D Simulation in the Installation of Nuclear Island Primary Loop Equipment

doi: 10.13832/j.jnpe.2015.S1.0024
  • Received Date: 2015-05-04
  • Rev Recd Date: 2015-07-30
  • Available Online: 2025-02-15
  • In order to minimize the potential risks during the first time application of new erection technology of "flip in the air" and "inclined introduction" for the nuclear island primary loop equipment, this paper presents a new approach of simulation to be used for the nuclear island primary equipment erection, which can perform dynamic simulation and process verification for primary equipment erection, and carry out collision inspection and space quantification between the equipment and the civil work structure of nuclear island building, and has been successfully applied for the installation of nuclear island primary equipment such as reactor vessel and Pressurizer.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (59) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return