Advance Search
Volume 36 Issue S1
Feb.  2025
Turn off MathJax
Article Contents
Zhang Jian, Liu Shun, Zou Xiangyang, Wang Yi. Test Plan for Digital Control System in Third Generation PWR Project[J]. Nuclear Power Engineering, 2015, 36(S1): 30-33. doi: 10.13832/j.jnpe.2015.S1.0030
Citation: Zhang Jian, Liu Shun, Zou Xiangyang, Wang Yi. Test Plan for Digital Control System in Third Generation PWR Project[J]. Nuclear Power Engineering, 2015, 36(S1): 30-33. doi: 10.13832/j.jnpe.2015.S1.0030

Test Plan for Digital Control System in Third Generation PWR Project

doi: 10.13832/j.jnpe.2015.S1.0030
  • Received Date: 2015-03-12
  • Rev Recd Date: 2015-06-23
  • Available Online: 2025-02-15
  • Based on the I & C architecture of third generation PWR, this paper presents the test plan, and justifies the reasonability. After the test on various subsidiary instrumentation and control systems, the system integration test is carried out. During the test, the test completeness and reasonability was taken into account.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (61) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return