This paper focus on the content and practice of the overall design of Third Generation PWR instrument and control. It mainly presents the methodology of overall I&C design and the detailed implementation rules, and therefore describes how the methodology and rules are applied for the third generation pressurized water reactor project. And also, it presents the problems faced in the licensing process and provides experience for future projects.