Considering the problems in the preliminary test stages for the process systems of electrical, instrumentation and control and part of the nuclear island in Taishan CEPR NPP, combined the overall commissioning schedule and prerequisites, the potential risk during commissioning phase is analyzed, and the measures to reduce the effect of these risks on the overall commissioning schedule are provided.