Advance Search
Volume 36 Issue S1
Feb.  2025
Turn off MathJax
Article Contents
Yu Weiming, Zhang Ke, Chen Shiji, Wu Jiabin. Schedule and Impacted Factors for Taishan CEPR Integral Commissioning[J]. Nuclear Power Engineering, 2015, 36(S1): 37-39. doi: 10.13832/j.jnpe.2015.S1.0037
Citation: Yu Weiming, Zhang Ke, Chen Shiji, Wu Jiabin. Schedule and Impacted Factors for Taishan CEPR Integral Commissioning[J]. Nuclear Power Engineering, 2015, 36(S1): 37-39. doi: 10.13832/j.jnpe.2015.S1.0037

Schedule and Impacted Factors for Taishan CEPR Integral Commissioning

doi: 10.13832/j.jnpe.2015.S1.0037
  • Received Date: 2015-03-12
  • Rev Recd Date: 2015-06-23
  • Available Online: 2025-02-15
  • Considering the problems in the preliminary test stages for the process systems of electrical, instrumentation and control and part of the nuclear island in Taishan CEPR NPP, combined the overall commissioning schedule and prerequisites, the potential risk during commissioning phase is analyzed, and the measures to reduce the effect of these risks on the overall commissioning schedule are provided.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (70) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return