Analysis of the overall strategy for various overhauling of CEPR as well as the duration of the main activities in each overhauling window found that the new design features, and new tools and materials contributed to the short outage duration for CEPR unit overhauling. This paper points out the main difficulties faced by the short duration of overhauling for Taishan CEPR units.