Advance Search
Volume 36 Issue S1
Feb.  2025
Turn off MathJax
Article Contents
Wang Jun, Jia Guoan. Analysis of Design Features for CEPR Unit Overhauling[J]. Nuclear Power Engineering, 2015, 36(S1): 44-46. doi: 10.13832/j.jnpe.2015.S1.0044
Citation: Wang Jun, Jia Guoan. Analysis of Design Features for CEPR Unit Overhauling[J]. Nuclear Power Engineering, 2015, 36(S1): 44-46. doi: 10.13832/j.jnpe.2015.S1.0044

Analysis of Design Features for CEPR Unit Overhauling

doi: 10.13832/j.jnpe.2015.S1.0044
  • Received Date: 2014-09-04
  • Rev Recd Date: 2014-12-20
  • Available Online: 2025-02-15
  • Analysis of the overall strategy for various overhauling of CEPR as well as the duration of the main activities in each overhauling window found that the new design features, and new tools and materials contributed to the short outage duration for CEPR unit overhauling. This paper points out the main difficulties faced by the short duration of overhauling for Taishan CEPR units.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (114) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return