Shao Chunbing, Xiang Wenxin, Ning Fangmao, Xiao Kaihua. Application of RSE-M 2010 in In-Service Inspection Program of CEPR Units[J]. Nuclear Power Engineering, 2015, 36(S1): 54-58. doi: 10.13832/j.jnpe.2015.S1.0054
Citation:
Shao Chunbing, Xiang Wenxin, Ning Fangmao, Xiao Kaihua. Application of RSE-M 2010 in In-Service Inspection Program of CEPR Units[J]. Nuclear Power Engineering, 2015, 36(S1): 54-58. doi: 10.13832/j.jnpe.2015.S1.0054
Shao Chunbing, Xiang Wenxin, Ning Fangmao, Xiao Kaihua. Application of RSE-M 2010 in In-Service Inspection Program of CEPR Units[J]. Nuclear Power Engineering, 2015, 36(S1): 54-58. doi: 10.13832/j.jnpe.2015.S1.0054
Citation:
Shao Chunbing, Xiang Wenxin, Ning Fangmao, Xiao Kaihua. Application of RSE-M 2010 in In-Service Inspection Program of CEPR Units[J]. Nuclear Power Engineering, 2015, 36(S1): 54-58. doi: 10.13832/j.jnpe.2015.S1.0054
The application of RSE-M2010 in the in-service inspection program of CEPR units is introduced in this paper, in terms of the latest evolution of RSE-M2010 and the CEPR design and construction, and the limitation and the solution are analyzed, to provide the new ideas to establish the specification for the in-service inspection of Chinese nuclear pressure equipment.