Advance Search
Volume 36 Issue S1
Feb.  2025
Turn off MathJax
Article Contents
Li Zheng. Mutual Standby and Debug of EAS and RIS under H4 Condition[J]. Nuclear Power Engineering, 2015, 36(S1): 111-113. doi: 10.13832/j.jnpe.2015.S1.0111
Citation: Li Zheng. Mutual Standby and Debug of EAS and RIS under H4 Condition[J]. Nuclear Power Engineering, 2015, 36(S1): 111-113. doi: 10.13832/j.jnpe.2015.S1.0111

Mutual Standby and Debug of EAS and RIS under H4 Condition

doi: 10.13832/j.jnpe.2015.S1.0111
  • Received Date: 2015-02-09
  • Rev Recd Date: 2015-06-20
  • Available Online: 2025-02-15
  • After the loss of coolant accident(LOCA) for preventing low pressure safety injection pump or a security shell spray pump function complete failure(H4) beyond design basis accident, design the H4 pipeline, in H4 conditions using still available low pressure safety injection pump or containment spray pump to realize the functions of the reactor core, long-term cooling. Of H4 condition under the safety injection system(RIS) and the containment spray system(EAS) reserve for test, by selecting features: low and high performance of the low pressure safety injection pump and low characteristic of the containment spray pump to verify the parameters in accident conditions can still meet the requirements, at the same time verified to the reactor coolant system(RCP) cooling system, thermal injection, outlet flow of the pump meet the Qinshan nuclear power plant expansion project(Fang Shan nuclear power project) debugging safety standards in the outline.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (82) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return