Advance Search
Volume 36 Issue S1
Feb.  2025
Turn off MathJax
Article Contents
Xu Qinghua. Fault Analysis and Improvement of Regional Power Monitor Loop for No.2 Shutdown System of Heavy Water Reactor[J]. Nuclear Power Engineering, 2015, 36(S1): 122-124. doi: 10.13832/j.jnpe.2015.S1.0122
Citation: Xu Qinghua. Fault Analysis and Improvement of Regional Power Monitor Loop for No.2 Shutdown System of Heavy Water Reactor[J]. Nuclear Power Engineering, 2015, 36(S1): 122-124. doi: 10.13832/j.jnpe.2015.S1.0122

Fault Analysis and Improvement of Regional Power Monitor Loop for No.2 Shutdown System of Heavy Water Reactor

doi: 10.13832/j.jnpe.2015.S1.0122
  • Received Date: 2015-04-28
  • Rev Recd Date: 2015-06-20
  • Available Online: 2025-02-15
  • No.2 shutdown system of CANDU-6 heavy water reactor in Qinshan III Nuclear Power Plant tripped several times due to the failure of the regional power monitor loop. Typical three channel trip failures were analyzed. The amplifier and potentiometer in the regional power monitor loop were analyzed theoretically and practically. Potentiometer failure contributed to the channel trip. Abrasion of contact patch and resistance thread because of long-term adjust is the main reason of potentiometer, according to the analysis of the failure potentiometer. Maintenance strategies such as periodic check and potentiometer replacement are developed, and the reliability of the regional power monitor loop is improved.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (48) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return