Xin Huimin. I&C Commissioning Strategies with Delayed Supply of DCS Equipments for Fangjiashan Nuclear Power Project[J]. Nuclear Power Engineering, 2015, 36(S1): 125-129. doi: 10.13832/j.jnpe.2015.S1.0125
Citation: Xin Huimin. I&C Commissioning Strategies with Delayed Supply of DCS Equipments for Fangjiashan Nuclear Power Project[J]. Nuclear Power Engineering, 2015, 36(S1): 125-129. doi: 10.13832/j.jnpe.2015.S1.0125

I&C Commissioning Strategies with Delayed Supply of DCS Equipments for Fangjiashan Nuclear Power Project

doi: 10.13832/j.jnpe.2015.S1.0125
  • Received Date: 2015-04-28
  • Rev Recd Date: 2015-06-27
  • Available Online: 2025-02-15
  • On condition that the supply schedule of the Digital Contral System(DCS) equipments were delayed for Fangjiashan nuclear power project unit 1, series of strategies were adopted in I&C commissioning to ensure the project progress, including the confirmation of DCS minimum system, separated supply of software and hardware, utilization of the PRE vision(prerequisite) in cover-opening functional tests of nuclear auxiliary system, adoption of temporary scheme in hydrostatic testing, and implementation of DEN on Site using domestic technology. Risk analysis, feasibility study and plan formulation were conducted for the strategies. The project practice indicated that the adopted strategies in I&C commissioning were effective, and helpful for the control of project progress.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (69) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return