Advance Search
Volume 36 Issue S1
Feb.  2025
Turn off MathJax
Article Contents
Wang Lingbin, Shi Zhonghua. Inspection, Analysis and Optimization Management for Control Rod of Qinshan Ⅱ NPP[J]. Nuclear Power Engineering, 2015, 36(S1): 143-146. doi: 10.13832/j.jnpe.2015.S1.0143
Citation: Wang Lingbin, Shi Zhonghua. Inspection, Analysis and Optimization Management for Control Rod of Qinshan Ⅱ NPP[J]. Nuclear Power Engineering, 2015, 36(S1): 143-146. doi: 10.13832/j.jnpe.2015.S1.0143

Inspection, Analysis and Optimization Management for Control Rod of Qinshan Ⅱ NPP

doi: 10.13832/j.jnpe.2015.S1.0143
  • Received Date: 2014-09-04
  • Rev Recd Date: 2014-12-20
  • Available Online: 2025-02-15
  • There is little experiences in the control rod operation of domestic nuclear power plants, and no control rod regulation or standard is available for the change of the control rods. In order to understand the control rod cladding, Qinshan II NPP checked the control rod cladding in service by nondestructive testing methods such as the ultrasonic and eddy current.,The reliable technical data for the operation of the control rods is obtained, to provide a basic for the adjustment and change of the control rod assemblies. In this paper, through the analysis and evaluation of the typical defect mechanism for the control rod assemblies, several measures to optimize the management of the control rods are proposed, to provide as a reference for the management of the control rods of other nuclear power plants.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (57) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return