Advance Search
Volume 37 Issue 1
Feb.  2025
Turn off MathJax
Article Contents
Zhu Xingli, Tian Ting, Zhou Lifeng, Chen Shu. Motion Simulation for Delivery Process of In-Service Inspection Equipment[J]. Nuclear Power Engineering, 2016, 37(1): 113-116. doi: 10.13832/j.jnpe.2016.01.0113
Citation: Zhu Xingli, Tian Ting, Zhou Lifeng, Chen Shu. Motion Simulation for Delivery Process of In-Service Inspection Equipment[J]. Nuclear Power Engineering, 2016, 37(1): 113-116. doi: 10.13832/j.jnpe.2016.01.0113

Motion Simulation for Delivery Process of In-Service Inspection Equipment

doi: 10.13832/j.jnpe.2016.01.0113
  • Received Date: 2015-04-07
  • Rev Recd Date: 2015-10-26
  • Available Online: 2025-02-15
  • AP1000 passive PWR steam generator and main pump is connected by welding, and these welds require in-service inspection. This paper focus on the 3D motion simulation route and its movement algorithm for inspection equipment, based on Open Inventor 3D engine. The developed 3D simulation system realizes the real-time simulation monitoring for the inspection equipment delivery process and working environment, and it has the important practical significance for promoting the intuitive of inspection equipment delivery process and improving the safety of inspection activities.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (54) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return