Advance Search
Volume 37 Issue 3
Feb.  2025
Turn off MathJax
Article Contents
Wang Jinkai, Lin Modi. Quantification Method for Nuclear Power Plant Seismic Risk[J]. Nuclear Power Engineering, 2016, 37(3): 51-53. doi: 10.13832/j.jnpe.2016.02.0051
Citation: Wang Jinkai, Lin Modi. Quantification Method for Nuclear Power Plant Seismic Risk[J]. Nuclear Power Engineering, 2016, 37(3): 51-53. doi: 10.13832/j.jnpe.2016.02.0051

Quantification Method for Nuclear Power Plant Seismic Risk

doi: 10.13832/j.jnpe.2016.02.0051
  • Received Date: 2015-07-09
  • Rev Recd Date: 2016-01-16
  • Available Online: 2025-02-15
  • In the seismic risk analysis for the nuclear power plant, the appropriate data processing method and analytical technique are required. In this study, seismic risk quantification software is developed independently for the first time in China. It uses Monte Carlo sampling method to simulate the seismic frequencies and component conditional failure probabilities, and integrates with accident sequences to assess the plant seismic risk. This method overcomes the shortcomings of the traditional probabilistic risk assessment modelling software in the seismic risk evaluation. Compared with the similar software abroad, this software is more reasonable in the uncertainty process.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (67) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return