Advance Search
Volume 37 Issue 4
Feb.  2025
Turn off MathJax
Article Contents
Zhang Hang, Deng Chunrui, Kong Xiangcheng, Zou Zhiqiang, Zhang Dan, Wu Lingjun, Su Yi. Preliminary Analysis of Probabilistic Safety Assessment for Underground Nuclear Power Plant[J]. Nuclear Power Engineering, 2016, 37(4): 125-129. doi: 10.13832/j.jnpe.2016.04.0125
Citation: Zhang Hang, Deng Chunrui, Kong Xiangcheng, Zou Zhiqiang, Zhang Dan, Wu Lingjun, Su Yi. Preliminary Analysis of Probabilistic Safety Assessment for Underground Nuclear Power Plant[J]. Nuclear Power Engineering, 2016, 37(4): 125-129. doi: 10.13832/j.jnpe.2016.04.0125

Preliminary Analysis of Probabilistic Safety Assessment for Underground Nuclear Power Plant

doi: 10.13832/j.jnpe.2016.04.0125
  • Received Date: 2016-03-25
  • Rev Recd Date: 2016-05-18
  • Available Online: 2025-02-15
  • Based on the natural safety advantages of underground nuclear reactors such as the bounding rock and soil, considering depressurization cavern, isolation gate, filtration and venting system, and compared with that of the normal ground NPPs, the large release frequency(LRF) for underground NPPs is analyzed with probabilistic safety assessment(PSA) method. Analysis results show that the LRF of underground NPPs is at least two orders of magnitude lower than that of the ground NPPs, so the goal of practical elimination of large release by design could be realized.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (69) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return