Advance Search
Volume 38 Issue 2
Feb.  2025
Turn off MathJax
Article Contents
Wang Yan, Zhang Zhijian, Zhang Min, Zhang Huazhi, Ma Yingfei. Study on Instantaneous Risk Calculation in Real-Time Online Risk Monitor[J]. Nuclear Power Engineering, 2017, 38(2): 161-164. doi: 10.13832/j.jnpe.2017.02.0161
Citation: Wang Yan, Zhang Zhijian, Zhang Min, Zhang Huazhi, Ma Yingfei. Study on Instantaneous Risk Calculation in Real-Time Online Risk Monitor[J]. Nuclear Power Engineering, 2017, 38(2): 161-164. doi: 10.13832/j.jnpe.2017.02.0161

Study on Instantaneous Risk Calculation in Real-Time Online Risk Monitor

doi: 10.13832/j.jnpe.2017.02.0161
  • Received Date: 2016-10-29
  • Rev Recd Date: 2016-12-20
  • Available Online: 2025-02-09
  • In the exiting risk monitor,the configuration information of specified plant is obtained by manual input.The historical running status and corresponding times of the devices cannot be put into risk monitor.In the Real-Time On-Line Risk Monitor(RORM) the running status and time of the components are collected and stored by automatic mode and manual mode.The historical running status and time from start to failure are considered in the cumulative failure probability of specified successive operating device.For example,two parallel pumps in a system experience the operation,hot reserve and then operation.The cumulative failure distribution functions of running failure basic event of two pumps are given.The functions show the instantaneous risk is related to the historical running status and time.The instantaneous risk curve shows an increasing trend with the time.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (66) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return