Advance Search
Volume 38 Issue 3
Feb.  2025
Turn off MathJax
Article Contents
Wang Yan, Zhang Zhijian, Zhang Min, Chen Sijuan, Wang He, Xu Anqi. Study on Allowed Configuration Time in Real-Time Risk Monitoring and Management[J]. Nuclear Power Engineering, 2017, 38(3): 104-106. doi: 10.13832/j.jnpe.2017.03.0104
Citation: Wang Yan, Zhang Zhijian, Zhang Min, Chen Sijuan, Wang He, Xu Anqi. Study on Allowed Configuration Time in Real-Time Risk Monitoring and Management[J]. Nuclear Power Engineering, 2017, 38(3): 104-106. doi: 10.13832/j.jnpe.2017.03.0104

Study on Allowed Configuration Time in Real-Time Risk Monitoring and Management

doi: 10.13832/j.jnpe.2017.03.0104
  • Received Date: 2016-10-21
  • Rev Recd Date: 2017-04-28
  • Available Online: 2025-02-09
  • Risk information of NPP’s current configuration is obtained through real-time risk monitoring technology and used in real-time risk management,which reflect the state of nuclear power plant and improve the safety and economy.Allowed Configuration Time(ACT) is a risk target which used to evaluate configuration about unavailable components in real-time configuration risk management.This paper presents the calculation method of ACT based on real-time risk.The calculation of ACT of configuration about multiple outage components considers the accumulated risk increment about equipment that remains unavailable across the configurations.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (99) PDF downloads(3) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return