Advance Search
Volume 38 Issue 5
Feb.  2025
Turn off MathJax
Article Contents
Zhang Haizhou, Cao Yunlong. Analysis for Startup Physics Test of First 18 Months Refueling for Unit 1 of Hongyanhe Nuclear Power Plant[J]. Nuclear Power Engineering, 2017, 38(5): 1-3. doi: 10.13832/j.jnpe.2017.05.0001
Citation: Zhang Haizhou, Cao Yunlong. Analysis for Startup Physics Test of First 18 Months Refueling for Unit 1 of Hongyanhe Nuclear Power Plant[J]. Nuclear Power Engineering, 2017, 38(5): 1-3. doi: 10.13832/j.jnpe.2017.05.0001

Analysis for Startup Physics Test of First 18 Months Refueling for Unit 1 of Hongyanhe Nuclear Power Plant

doi: 10.13832/j.jnpe.2017.05.0001
  • Received Date: 2016-10-18
  • Rev Recd Date: 2017-04-16
  • Available Online: 2025-02-09
  • The start-up physical test of 18-months refueling for unit 1 of Hongyanhe Nuclear Power Plant has completed. The results show that the predicted value of 18-months refueling theory is in good agreement with the measured results. The results verified the accuracy of refueling design. In this paper, the results from the startup physical tests after 18 months refueling and the 12 months refueling were compared, and the changes of core characteristics for 18-months refueling core are pointed out and analyzed.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (55) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return