Advance Search
Volume 39 Issue 6
Dec.  2018
Turn off MathJax
Article Contents
Guo Jiaxu. Analysis and Optimization of Reactor Transient Fault Caused by Protection System Switch Fault[J]. Nuclear Power Engineering, 2018, 39(6): 186-188. doi: 10.13832/j.jnpe.2018.06.0186
Citation: Guo Jiaxu. Analysis and Optimization of Reactor Transient Fault Caused by Protection System Switch Fault[J]. Nuclear Power Engineering, 2018, 39(6): 186-188. doi: 10.13832/j.jnpe.2018.06.0186

Analysis and Optimization of Reactor Transient Fault Caused by Protection System Switch Fault

doi: 10.13832/j.jnpe.2018.06.0186
  • Received Date: 2017-10-23
  • Rev Recd Date: 2018-05-18
  • When the analog channel test of reactor protection system(T1 test) in Qinshan Phase Ⅱ Nuclear Power Plant, the transient fault of the unit was caused by the failure of the switch. In this paper, based on the transient fault caused by the switch fault during the test, the switch body is analyzed, and the method of switch switching verification is proposed. Combined with the work practice, the optimized maintenance strategy is put forward, which effectively ensures the safe and stable operation of the unit.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (214) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return