CAO Zhipeng, ZHANG Chaowen, DAI Zhonghua, WANG Qinhu. Treatment of High Pressure Difference of RRI/SEC Heat Exchanger in Daya Bay Nuclear Power Station[J]. Nuclear Power Engineering, 2005, 26(S1): 120-122.
Citation:
|
CAO Zhipeng, ZHANG Chaowen, DAI Zhonghua, WANG Qinhu. Treatment of High Pressure Difference of RRI/SEC Heat Exchanger in Daya Bay Nuclear Power Station[J]. Nuclear Power Engineering, 2005, 26(S1): 120-122.
|
CAO Zhipeng, ZHANG Chaowen, DAI Zhonghua, WANG Qinhu. Treatment of High Pressure Difference of RRI/SEC Heat Exchanger in Daya Bay Nuclear Power Station[J]. Nuclear Power Engineering, 2005, 26(S1): 120-122.
Citation:
|
CAO Zhipeng, ZHANG Chaowen, DAI Zhonghua, WANG Qinhu. Treatment of High Pressure Difference of RRI/SEC Heat Exchanger in Daya Bay Nuclear Power Station[J]. Nuclear Power Engineering, 2005, 26(S1): 120-122.
|
Treatment of High Pressure Difference of RRI/SEC Heat Exchanger in Daya Bay Nuclear Power Station
-
Daya Bay Nuclear Power Operation and Management Co. Ltd., Shenzhen, Guangdong, 518124, China
- Received Date: 2005-08-22
- Rev Recd Date:
2005-10-08
Available Online:
2025-07-25