Advance Search
Volume 29 Issue 5
Oct.  2008
Turn off MathJax
Article Contents
LI Maohui, YANG Chengde. Electrical Penetration Assembly for Fast Critical Assembly[J]. Nuclear Power Engineering, 2008, 29(5): 107-108,113.
Citation: LI Maohui, YANG Chengde. Electrical Penetration Assembly for Fast Critical Assembly[J]. Nuclear Power Engineering, 2008, 29(5): 107-108,113.

Electrical Penetration Assembly for Fast Critical Assembly

  • Received Date: 2008-06-30
  • Rev Recd Date: 2008-09-05
  • Publish Date: 2008-10-15
  • A electrical penetration assembly which does not require to cut cables and can be used in the hall for the fast critical assembly is introduced in this paper. The structure of the electrical penetration assembly is simple and facilitates the cable replacement. The results from the leakage test on the electrical penetration assembly and the hall indicate that the leakage ratio is less than the design ratio, and the overall seal performance of the hall satisfies the requirement on the normal operation and accident conditions for the fast critical assembly.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (12) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return