The pour of mass concrete,which requires an effective control of possible cracks,is a key technical element in the civil construction of nuclear power plants.This paper offers a detailed description of the main measures and the effectiveness for the control of mass concrete cracks of Chashma Nuclear Power Plant Unit 2.