Advance Search
Volume 30 Issue 2
Apr.  2009
Turn off MathJax
Article Contents
WU Feng-qi, LU Xiu-sheng. Bridge Balance Control of Fuel Handling Machine for Daya Bay Nuclear Power Plant[J]. Nuclear Power Engineering, 2009, 30(2): 75-77.
Citation: WU Feng-qi, LU Xiu-sheng. Bridge Balance Control of Fuel Handling Machine for Daya Bay Nuclear Power Plant[J]. Nuclear Power Engineering, 2009, 30(2): 75-77.

Bridge Balance Control of Fuel Handling Machine for Daya Bay Nuclear Power Plant

  • Received Date: 2007-06-25
  • Rev Recd Date: 2008-07-21
  • Available Online: 2025-07-28
  • Publish Date: 2009-04-15
  • In order to improve the outage efficiency of Daya Bay Nuclear Power Station,it is necessary to modify the motor-driven types of the fuel handling machine bridge,This paper focuses on the problems for the existing bridge crane for nuclear fule transportation and the characteristics and implementation of the new solution.After modification,the bridge crane was driven by two motors controlled by two separately motor drives,and a PLC was used to balance the operation of the two motors.This solution solved the synchronization problem under the high speed and long traveling distance for the bridge crane.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (6) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return