Advance Search
Volume 31 Issue 2
Apr.  2010
Turn off MathJax
Article Contents
LI Chunmei, LUO Mingkun, LI Shuzhou, NIU Wenhua, YANG Hong, CUI Huaiming. Design of Vacuum Releaser of the Primary Circuit of LingAo Nuclear Power Plant[J]. Nuclear Power Engineering, 2010, 31(2): 94-97.
Citation: LI Chunmei, LUO Mingkun, LI Shuzhou, NIU Wenhua, YANG Hong, CUI Huaiming. Design of Vacuum Releaser of the Primary Circuit of LingAo Nuclear Power Plant[J]. Nuclear Power Engineering, 2010, 31(2): 94-97.

Design of Vacuum Releaser of the Primary Circuit of LingAo Nuclear Power Plant

  • Received Date: 2009-02-13
  • Rev Recd Date: 2010-02-04
  • Available Online: 2025-07-29
  • Publish Date: 2010-04-01
  • This thesis describes the design scheme,main capability parameter,relative technical reform and operation process etc.of the vacuum releaser of the primary circuit system of LingAo nuclear power plant.After the vacuum releaser of the primary circuit system being operated on site,the pressure of the primary circuit system can be below 0.02 MPa.abs,it can save about 30 hours in filling water and draining air process of primary circuit system.The design parameter and operation parameter of the vacuum releaser of the primary circuit system are better than the similar equipment of foreign country.This technique replaces a number of previous processes of static and dynamic draining air in the large-scale domestic nuclear power plant before filling water of no-fuel hydrostatic test,it is the first time to realize the vacuum releasing air in the large-scale domestic nuclear power plant before filling water of no-fuel hydrostatic test.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (7) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return