Advance Search
Volume 31 Issue 6
Dec.  2010
Turn off MathJax
Article Contents
LUO Hai-ying, WANG Jian-hua, LI Wen-hui, GUO Jing-ren. Evaluation of Emergency Planning Zone for EPR Nuclear Power Unit in TSNPP[J]. Nuclear Power Engineering, 2010, 31(6): 117-122.
Citation: LUO Hai-ying, WANG Jian-hua, LI Wen-hui, GUO Jing-ren. Evaluation of Emergency Planning Zone for EPR Nuclear Power Unit in TSNPP[J]. Nuclear Power Engineering, 2010, 31(6): 117-122.

Evaluation of Emergency Planning Zone for EPR Nuclear Power Unit in TSNPP

  • Received Date: 2009-06-23
  • Rev Recd Date: 2010-05-18
  • Available Online: 2025-07-31
  • Publish Date: 2010-12-01
  • The Emergency Planning Zone(EPZ) of EPR unit was evaluated using the MELCORE Accident Consequence Code System 2(MACCS2) developed by Sandia National Laboratory.Hourly meteorological data were collected from Sep 2007 to Aug 2008 by the site meteorological monitoring system.The accident source term including the core inventory and release characteristics were based on EPR PSA Level 2.Based on NUREG-0396 and GB/T 17680.1-2008,this paper put forward the quantitative safety criteria.The effective dose and thyroid dose were calculated.By comparing the result to the protective guide and safety criteria,a radius of 0.5 km was evaluated for EPR unit in TSNPP.We suggested that a radius of 4 km is the reasonable conservative value of interior EPZ for TSNPP and for exterior EPZ the value is 7km.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (4) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return