Advance Search
Volume 25 Issue 3
Jun.  2004
Turn off MathJax
Article Contents
SHAO Bi-xiu. Management Self-assessment in Construction Phase of Nuclear Power Station[J]. Nuclear Power Engineering, 2004, 25(3): 284-288.
Citation: SHAO Bi-xiu. Management Self-assessment in Construction Phase of Nuclear Power Station[J]. Nuclear Power Engineering, 2004, 25(3): 284-288.

Management Self-assessment in Construction Phase of Nuclear Power Station

  • Received Date: 2004-02-23
  • Rev Recd Date: 2004-03-10
  • Available Online: 2025-07-28
  • Publish Date: 2004-06-01
  • Management self-assessment is one of the quality management methods to achieve the organization’s continuous improvement. Through the investigation of the methods, the author hopes to give guideline to the management at all levels involved in the construction of nuclear power station in the implementation of management self-assessment, and also to make the management self-assessment more normalized, systematical and effective.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (8) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return