ZHANG Zhi-hua, DENG Yue, LIU Yao-guang, XU Xian-qi, ZHOU Shan, QIAN Da-zhi, ZHANG Yang. Quality Assurance and Quality Control of Nuclear Engineering during Construction Phase[J]. Nuclear Power Engineering, 2007, 28(2): 101-104.
Citation:
|
ZHANG Zhi-hua, DENG Yue, LIU Yao-guang, XU Xian-qi, ZHOU Shan, QIAN Da-zhi, ZHANG Yang. Quality Assurance and Quality Control of Nuclear Engineering during Construction Phase[J]. Nuclear Power Engineering, 2007, 28(2): 101-104.
|
ZHANG Zhi-hua, DENG Yue, LIU Yao-guang, XU Xian-qi, ZHOU Shan, QIAN Da-zhi, ZHANG Yang. Quality Assurance and Quality Control of Nuclear Engineering during Construction Phase[J]. Nuclear Power Engineering, 2007, 28(2): 101-104.
Citation:
|
ZHANG Zhi-hua, DENG Yue, LIU Yao-guang, XU Xian-qi, ZHOU Shan, QIAN Da-zhi, ZHANG Yang. Quality Assurance and Quality Control of Nuclear Engineering during Construction Phase[J]. Nuclear Power Engineering, 2007, 28(2): 101-104.
|
Quality Assurance and Quality Control of Nuclear Engineering during Construction Phase
-
Institute of Nuclear Physics and Chemistry, CAEP, Mianyang, Sichuan, 621900, China
- Received Date: 2006-06-06
- Rev Recd Date:
2006-11-23
Available Online:
2025-07-21