This paper described the feed water control system of the auxiliary boiler steam drum in Qinshan phase III nuclear power plant, analyzed the deficiency of the original configuration, and proposed the optimized configuration. The optimized feed water control system can ensure the stable and safe operation of the auxiliary boiler, and the normal operation of the users.