Advance Search
Volume 26 Issue S1
Jun.  2005
Turn off MathJax
Article Contents
GUAN Jianjun, HAN Qinghao, YANG Jicheng. Cause Analysis of the Acetylene Produced in Main Transformer Phase B in LNPS[J]. Nuclear Power Engineering, 2005, 26(S1): 116-119.
Citation: GUAN Jianjun, HAN Qinghao, YANG Jicheng. Cause Analysis of the Acetylene Produced in Main Transformer Phase B in LNPS[J]. Nuclear Power Engineering, 2005, 26(S1): 116-119.

Cause Analysis of the Acetylene Produced in Main Transformer Phase B in LNPS

  • Received Date: 2005-08-22
  • Rev Recd Date: 2005-09-14
  • Available Online: 2025-07-25
  • In the analysis of main transformer phase B of unit 2 in Ling’ao Nuclear Power Station(LNPS) by chromatography,acetylene was found.In order to carry out the inside check,the main transformer had been stopped and restored after necessary maintenances.But shortly,0.86 μL·L-1 acetylene was measured,so the transformer had to be replaced for the safe operation in a new cycle.The paper analyzed the most possible causes based on the check results after lifting the tank of transformer,and the new corrective measurements and the considerations were provided to improve the transformer reliability.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (3) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return