LING Xing, HUANG Su-yi. Discussion on Replacement of Steam Generator[J]. Nuclear Power Engineering, 2004, 25(3): 267-269.
Citation: LING Xing, HUANG Su-yi. Discussion on Replacement of Steam Generator[J]. Nuclear Power Engineering, 2004, 25(3): 267-269.

Discussion on Replacement of Steam Generator

  • Received Date: 2003-02-04
  • Rev Recd Date: 2004-02-23
  • Available Online: 2025-07-28
  • Publish Date: 2004-06-01
  • The replacement of steam generators requires 35 to 60 days in general. The design demonstration and safety review for the building storing the replaced steam generators shall be also carried out based on the related national codes on nuclear safety, while the demonstration and review of the replacement scheme are conducted. All prerequisites and conditions shall be available prior to the implementation of the SG replacement. The feasibility of the processes to be adopted shall be demonstrated.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (10) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return