Advance Search
Volume 31 Issue 3
Jun.  2010
Turn off MathJax
Article Contents
SHI Jie. Optimization of Preventive Maintenance Cycle Based on Experimental Feedback in Nuclear Power Plants[J]. Nuclear Power Engineering, 2010, 31(3): 102-105,112.
Citation: SHI Jie. Optimization of Preventive Maintenance Cycle Based on Experimental Feedback in Nuclear Power Plants[J]. Nuclear Power Engineering, 2010, 31(3): 102-105,112.

Optimization of Preventive Maintenance Cycle Based on Experimental Feedback in Nuclear Power Plants

  • Received Date: 2009-01-12
  • Rev Recd Date: 2009-04-08
  • Available Online: 2025-07-29
  • Publish Date: 2010-06-01
  • The preventive replacement method based on the experimental feedback was introduced.In this method,the initial preventive replacement cycle was acquired by expert votes.The preventive replacement cycle combined with the operation experience of the equipment was gained by means of Bayesian theorem.The Optimized preventive replacement cycle can be acquired by comparing the two probabilities that no fault occurs within the cycle.This method was tested on the switches which were used in Daya Bay Nuclear Power Plant and the results indicated its validity.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (8) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return