The physical model test is an essential link in the bank protection engineering design.It is the final verification to engineering design result,and afford the decision for the final plan of engineering design.This paper used the normal model test and the availability stress method to analyze the stability of Haiyang nuclear power bank protection project,and finally confirmed that the cross section design is safe and reason-able.