Advance Search
Volume 31 Issue 6
Dec.  2010
Turn off MathJax
Article Contents
SHI Jie. Preventative Maintenance Cycle of Contact Switches for Nuclear Power Plants Based on Lifetime Assessment and Economic Analysis[J]. Nuclear Power Engineering, 2010, 31(6): 106-112.
Citation: SHI Jie. Preventative Maintenance Cycle of Contact Switches for Nuclear Power Plants Based on Lifetime Assessment and Economic Analysis[J]. Nuclear Power Engineering, 2010, 31(6): 106-112.

Preventative Maintenance Cycle of Contact Switches for Nuclear Power Plants Based on Lifetime Assessment and Economic Analysis

  • Received Date: 2009-09-02
  • Rev Recd Date: 2010-06-04
  • Available Online: 2025-07-31
  • Publish Date: 2010-12-01
  • An approach to determine the preventive maintenance cycle was proposed in consideration of the lifetime,optimal cost and economy.Two parameters Weibull distribution was used to calculate the lifetime of contact switch.The block replacement model and age replacement model were built with the objective of optimal cost,and the preventive replacement cycle was accounted.Eight proposals for preventive replacement cycle were given.Economy model was applied to assess those proposals and the optimal proposal was confirmed.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (7) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return