Advance Search
Volume 26 Issue 5
Oct.  2005
Turn off MathJax
Article Contents
SHI Liang-min, MA Li-min, FAN Kai. Analysis of Critical Paths for Schedule Control of Nuclear Power Projects[J]. Nuclear Power Engineering, 2005, 26(5): 514-518.
Citation: SHI Liang-min, MA Li-min, FAN Kai. Analysis of Critical Paths for Schedule Control of Nuclear Power Projects[J]. Nuclear Power Engineering, 2005, 26(5): 514-518.

Analysis of Critical Paths for Schedule Control of Nuclear Power Projects

  • Received Date: 2004-11-17
  • Rev Recd Date: 2005-05-25
  • Available Online: 2025-07-31
  • Publish Date: 2005-10-15
  • Study on the critical paths for the schedule control of nuclear power projects has been performed for reactor M310,based on the experiences from Daya Bay project and Ling Ao project.The study shows that the critical paths for the nuclear power project are from NI civil work,NI erection,commissioning of single systems directly serving the CFT to the joint-test.For NI civil work,the critical path is the main civil work of the reactor building,pre-stressing,handover of room s for important areas,and key CW-erection interfaces;there are four critical paths for NI erection;For startup,two stages can be identified: commissioning of 16 single systems directly serving the CFT and joint-test.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (10) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return