Advance Search
Volume 30 Issue 3
Jun.  2009
Turn off MathJax
Article Contents
ZHU Jian-jun. Maintenance of Equipment and System during Installation and Commission of Nuclear Power Plants[J]. Nuclear Power Engineering, 2009, 30(3): 99-101.
Citation: ZHU Jian-jun. Maintenance of Equipment and System during Installation and Commission of Nuclear Power Plants[J]. Nuclear Power Engineering, 2009, 30(3): 99-101.

Maintenance of Equipment and System during Installation and Commission of Nuclear Power Plants

  • Received Date: 2008-06-05
  • Rev Recd Date: 2008-10-22
  • Available Online: 2025-07-28
  • Publish Date: 2009-06-15
  • This paper studied the necessity to carry out special maintenance of equipment and system during the installation and commission of nuclear power plants, and at the same time discussed how to organize the special maintenance of equipment and system.Some technical advices are proposed on the maintenance of the equipment and system during the installation and commission considering the characteristics of nuclear power plants, to ensure a high availability of the equipment and system of nuclear power plants during the normal operation.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (8) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return