Advance Search
Volume 26 Issue 1
Feb.  2005
Turn off MathJax
Article Contents
CHEN Zhen-wei, SANG Shu-hui. Improvement of Static Load Test Technology for Polar Crane in Ling’ao Nuclear Power Station[J]. Nuclear Power Engineering, 2005, 26(1): 63-64,87.
Citation: CHEN Zhen-wei, SANG Shu-hui. Improvement of Static Load Test Technology for Polar Crane in Ling’ao Nuclear Power Station[J]. Nuclear Power Engineering, 2005, 26(1): 63-64,87.

Improvement of Static Load Test Technology for Polar Crane in Ling’ao Nuclear Power Station

  • Received Date: 2003-09-15
  • Rev Recd Date: 2004-01-09
  • Available Online: 2025-07-25
  • Publish Date: 2005-02-15
  • The test instrument and method for polar crane are improved to facilitate the load test (especially double-hook combine static load test ). The paper introduces the test requirement and conventional test method for polar crane static load test for 1000MWe PWR nuclear power station and the static load test technology improvement for polar crane in Ling’ao Nuclear Power Station .

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (4) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return