Advance Search
Volume 26 Issue S1
Jun.  2005
Turn off MathJax
Article Contents
QI Panjin, XIAO Min, SUN Jiliang, ZHANG Shishun. Study of Station Blackout Caused Severe Accident Process in Daya Bay Nuclear Power Station[J]. Nuclear Power Engineering, 2005, 26(S1): 55-57,61.
Citation: QI Panjin, XIAO Min, SUN Jiliang, ZHANG Shishun. Study of Station Blackout Caused Severe Accident Process in Daya Bay Nuclear Power Station[J]. Nuclear Power Engineering, 2005, 26(S1): 55-57,61.

Study of Station Blackout Caused Severe Accident Process in Daya Bay Nuclear Power Station

  • Received Date: 2005-08-22
  • Rev Recd Date: 2005-10-08
  • Available Online: 2025-07-25
  • Based on the severe accident calculation results of Daya Bay Nuclear Power Station,this paper analyzes a certain of accident sequence and the mitigating measures of severe accident.The results show that the top of core will be uncovered about 1~2 hours later,and the reactor pressure vessel will fail after 5~7 hours.The containment will fail after about 100 hours.The cavity basement can be penetrated about 5.5m after 8.7 days.The results also show that the pit flooding can prevent the melt-through of the basement and reduce hydrogen mass from interaction of molten corium with concrete.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (3) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return