During the commissioning of Ling’ao nuclear power station, it was found that abnormal operation in DVN was caused by the unreasonable design in negative pressure monitoring system. This paper emphasizes on the analyzing of how the negative pressure monitoring system works and what is the problem unsolved,and finally introduces the measures and solutions adopted to improve this system.