Advance Search
Volume 35 Issue 5
Feb.  2025
Turn off MathJax
Article Contents
Liu Xiaoheng. Schedule Management of Nuclear Island Design of First Kind of AP1000 Unit[J]. Nuclear Power Engineering, 2014, 35(5): 182-184. doi: 10.13832/j.jnpe.2014.05.0182
Citation: Liu Xiaoheng. Schedule Management of Nuclear Island Design of First Kind of AP1000 Unit[J]. Nuclear Power Engineering, 2014, 35(5): 182-184. doi: 10.13832/j.jnpe.2014.05.0182

Schedule Management of Nuclear Island Design of First Kind of AP1000 Unit

doi: 10.13832/j.jnpe.2014.05.0182
  • Received Date: 2013-06-27
  • Rev Recd Date: 2014-06-15
  • Available Online: 2025-02-15
  • Based on the schedule management for the first reactor of advanced passive pressurized water reactor(AP1000), this paper states the major problems under the complicated contractual relationships, focusing on the design of first reactor and the first-time manufacture of primary equipment as well as the modular construction, combined with the actual situation of Sanmen nuclear power project construction, and discusses and analyzes the major challenges and difficulties that the first AP1000 nuclear island design imposed on the scheduling management. A series of countermeasures is taken to minimize the impact on schedule delay of the design of first reactor. It also intends to put forward, in view of the experience and lessons learned in Sanmen nuclear power project construction, some suggestions for the schedule management of the future AP1000 projects.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (29) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return