Bai Chengfei, Wang Xinxin, Cai Dechang. Extended Low Power Operation Justification of Two Typical First Cycle for CPR1000[J]. Nuclear Power Engineering, 2014, 35(S2): 1-3. doi: 10.13832/j.jnpe.2014.S2.0001
Citation:
Bai Chengfei, Wang Xinxin, Cai Dechang. Extended Low Power Operation Justification of Two Typical First Cycle for CPR1000[J]. Nuclear Power Engineering, 2014, 35(S2): 1-3. doi: 10.13832/j.jnpe.2014.S2.0001
Bai Chengfei, Wang Xinxin, Cai Dechang. Extended Low Power Operation Justification of Two Typical First Cycle for CPR1000[J]. Nuclear Power Engineering, 2014, 35(S2): 1-3. doi: 10.13832/j.jnpe.2014.S2.0001
Citation:
Bai Chengfei, Wang Xinxin, Cai Dechang. Extended Low Power Operation Justification of Two Typical First Cycle for CPR1000[J]. Nuclear Power Engineering, 2014, 35(S2): 1-3. doi: 10.13832/j.jnpe.2014.S2.0001
The ability of extended low power operation(ELPO)of two typical first cycles(with Pyrex or gadolinium) for CPR1000 are analyzed and demonstrated respectively. The results showed that with the appropriate operation limits, both of the two typical first cycles are feasible for ELPO.