The RCP of Fangjiashan NPP is much different with that in other nuclear power plants in China. This paper firstly introduces the generational of RCP, then expound the problems and ways in commission. The main problems, such as the large vibration of pump shaft, the maladjustment of main coolant pump logic on site and the problems of shaft seal and the oil system,are analyzed and discussed with the technicians and system designers, and solved.