Wang Zhixiao. Feasibility Analysis for Increasing Purification Flowrate during Plant Shutdown Oxygenation[J]. Nuclear Power Engineering, 2015, 36(3): 120-124. doi: 10.13832/j.jnpe.2015.03.0120
Citation:
Wang Zhixiao. Feasibility Analysis for Increasing Purification Flowrate during Plant Shutdown Oxygenation[J]. Nuclear Power Engineering, 2015, 36(3): 120-124. doi: 10.13832/j.jnpe.2015.03.0120
Wang Zhixiao. Feasibility Analysis for Increasing Purification Flowrate during Plant Shutdown Oxygenation[J]. Nuclear Power Engineering, 2015, 36(3): 120-124. doi: 10.13832/j.jnpe.2015.03.0120
Citation:
Wang Zhixiao. Feasibility Analysis for Increasing Purification Flowrate during Plant Shutdown Oxygenation[J]. Nuclear Power Engineering, 2015, 36(3): 120-124. doi: 10.13832/j.jnpe.2015.03.0120
Using RCV system hydraulic model, the feasibility of increasing purification flowrate during plant shutdown oxygenation of M310 units is analyzed, and a basic engineering modification for this item is provided. The result indicates that the purification flowrate increase from 27.2 m3/h to 40 m3/h, and it can save two hour at least in every maintenance period of the 1000 MW nuclear power unit.